In 1957 a new grade separation structure was built at the east end of the bridge. This allowed north bound traffic on Elliot Avenue West to go over 15th Avenue West and connect directly to the bridge just west of the railroad tracks. This structure has "T" shaped column-bents with concrete girders and concrete deck. The five support columns west of the railroad tracks were built to match the octagonal shape of the original bridge columns. (Vault Plan 782-94)
In 1960 the first of two projects was done to strengthen the west half of the bridge. This project installed steel cross bracing at six locations to provide additional strength in the longitudinal direction. (Vault Plan 782-100) The second project, completed in 1961, installed steel trusses for deck slab stiffening; removed the north sidewalk and rail, replacing with a facia beam and an aluminum tubular rail; removed a portion of the south sidewalk, replacing with facia beam and a standard aluminum pedestrian railing; and installed new light poles (Vault Plan 782-104)
In 1974 the eastern half of the bridge was retrofitted with steel trusses to provide additional strength to the deck slab, similar to what was done on the westerly portion in 1961. (Vault Plan 777-222) In 1981 the north side rail that was installed in 1961 was removed and replaced with a Jersey-type concrete barrier-railing. The same type barrier was placed along the south curb line to protect pedestrians from moving traffic. (Vault Plan 782-147)
In 1991 new ramps were constructed to serve the Elliot Bay Marina. These were connected to the ramp stubs that were left from removal of the old 23rd Avenue trestle in the early 40's. These ramps are concrete with battered steel column supports. (Vault Plan 782-131)
In 1997 a landslide damaged the bracing between the bridge columns at the westerly most end of the bridge. New steel cross bracing and deck support structures were installed to repair and strengthen this section of the bridge. (Vault Plan 782-200)
The bridge was again damaged by the February 28, 2001 Nisqually earthquake. Nearly half of the original concrete lateral braces from bent 49 through bent 75 were damaged beyond repair. All of the concrete braces within this section of the bridge were replaced with tubular steel bracing. (Vault Plan 782-234)