Rating:
No votes cast

Sellwood Bridge (2015)

Photo 

Sellwood Bridge (New)

Photo from Steve Morgan via Wikipedia

Enlarge

View this photo on Wikipedia

BH Photo #446634

Map 

Street View 

Video 

Timelapse of construction

Timelapse of construction

public agency

Play video

Facts 

Overview
Steel arch bridge over Willamette River on Tacoma Street
Location
Portland, Multnomah County, Oregon
Status
Open to traffic
History
Built 2015
Builders
- David Goodyear (Chief Engineer)
- Eric Rau (Design Engineer)
- T.Y. Lin International of San Francisco, California
Design
Steel arch
Dimensions
Length of largest span: 464.9 ft.
Total length: 1,977.1 ft.
Deck width: 6.2 ft.
Approximate latitude, longitude
+45.46409, -122.66570   (decimal degrees)
45°27'51" N, 122°39'57" W   (degrees°minutes'seconds")
Approximate UTM coordinates
10/526134/5034561 (zone/easting/northing)
Average daily traffic (as of 2010)
33,495
Inventory numbers
OR 21493 (Oregon Dept. of Transportation structure number)
BH 84967 (Bridgehunter.com ID)
Inspection report (as of February 2017)
Overall condition: Good
Superstructure condition rating: Very Good (8 out of 9)
Substructure condition rating: Good (7 out of 9)
Deck condition rating: Good (7 out of 9)
Sufficiency rating: 81 (out of 100)
View more at BridgeReports.com

Update Log 

  • October 19, 2020: New video from Craig Philpott
  • April 15, 2019: New photo from Geoff Hubbs

Sources