ODOT 1249681 (Ohio Dept. of Transportation structure file number)
BH 60806 (Bridgehunter.com ID)
Inspection report (as of November 2014)
Overall condition: Fair
Superstructure condition rating: Fair(5 out of 9)
Substructure condition rating: Fair(5 out of 9)
Deck condition rating: Fair(5 out of 9)
Sufficiency rating: 40.2 (out of 100) View more at BridgeReports.com
Categories
Update Log
July 25, 2015: New photos from Eric Root
April 30, 2014: Updated by Luke Harden: Merged NBI
Posted July 25, 2015, by Eric Root (ejort [at] att [dot] net)
Vegetation on either side has been cleared. Now there is a sign informing that the road will soon be closed for 75 days. Oh, and there's a crane parked next to the road. I fear this bridge will very soon be gone.
Vegetation on either side has been cleared. Now there is a sign informing that the road will soon be closed for 75 days. Oh, and there's a crane parked next to the road. I fear this bridge will very soon be gone.