4 Span Through plate girder
Western spans built 1958 by Bethlehem Steel Company during an apparent channel shift
Eastern Spans built 1912-3 by Wisconsin Bridge & Iron Company during original double tracking of line
Dimensions
Length of largest span: 40.0 ft.
Total length: 160.0 ft.
Also called
MILW Bridge #O-236
Approximate latitude, longitude
+44.94405, -95.72925(decimal degrees) 44°56'39" N, 95°43'45" W (degrees°minutes'seconds")