Preliminary studies are under way for the eventual replacement of this bridge. A likely scenario involves keeping the girder approach spans and replacing the main truss span. No design concepts have been proposed yet. A detailed inspection and load rating of the approach spans is just getting started. Any replacement project will be at least 10 years down the road, but be forewarned!
The Blatnik Bridge underwent a major rehab project in 2012-2013, which included reinforcement of some gusset plates, new strip-seal and modular deck joints, repainting of the truss and approach spans and a new decorative lighting system. Repairs enabled the 40-ton load limit to be removed; the bridge is no longer posted.
The view to the right from the Blatnik Bridge is of Superior Bay.
See the related bridge just added.
I find it a bit interesting that while a page exists for the Blatnik Bridge here, there's still nothing on the Bong Bridge just a bit farther south.