New construction, connecting an island separated by the navigation canal to a County Park Trail
Design
The Bascule span (apparently identical in design to the Miron Bridge in Menasha WI) spans the Navigation Canal; the Steel Pony Arch spans the outflow channel from a small generating station. The dry land approaches on the island are steel beam spans.
Approximate latitude, longitude
+44.45035, -88.06379(decimal degrees) 44°27'01" N, 88°03'50" W (degrees°minutes'seconds")