Willow Creek Bridge

Map 

Street View 

Facts 

Overview
Concrete tee beam bridge over Willow Creek on Sr 73 (Lr 06121)
Location
Berks County, Pennsylvania
Status
Open to traffic
History
Built 1927; rehabilitated 1973
Design
Concrete tee beam
Dimensions
Length of largest span: 37.1 ft.
Total length: 80.1 ft.
Deck width: 39.4 ft.
Approximate latitude, longitude
+40.44726, -75.89656   (decimal degrees)
40°26'50" N, 75°53'48" W   (degrees°minutes'seconds")
Approximate UTM coordinates
18/423970/4477786 (zone/easting/northing)
Quadrangle map:
Temple
Average daily traffic (as of 2017)
6,905
Inventory numbers
PANBI 04612 (Pennsylvania BRKEY bridge number on the 2011 NBI)
BH 78514 (Bridgehunter.com ID)
Inspection report (as of April 2017)
Overall condition: Poor
Superstructure condition rating: Fair (5 out of 9)
Substructure condition rating: Satisfactory (6 out of 9)
Deck condition rating: Poor (4 out of 9)
Sufficiency rating: 68.3 (out of 100)
View more at BridgeReports.com

Update Log 

  • September 21, 2017: New Street View added by Dana and Kay Klein

Comments 

Willow Creek Bridge
Posted July 14, 2019, by George Oakley (Georgeoakley49 [at] yahoo [dot] com)

From July 22 to August 23 Rte 73 will be closed between Rte 222 and Park Road for repairs to this bridge as per plans from PennDOT.Work includes concrete deck repairs,concrete beam and substructure repairs,bearing repairs,joint repairs/joint sealing and scour countermeasures/channel repairs.Local access will be maintained for property owners only.This bridge which was built in 1927 has an average daily traffic volume of 6,660 vehicles.PennDOT advises drivers to expect significant delays.

Willow Creek Bridge
Posted April 15, 2019, by George Oakley (Georgeoakley49 [at] yahoo [dot] com)

Just read in todays local paper that the supervisors discussed temporary weight restrictions be enforced on Schaeffer Road while this bridge is closed for repairs after April and lasting for 30 days.The main concern is truck traffic.Detour signs were discussed being placed on Rte 222 to dissuade truckers from travelling on Schaeffer Road during the closure.When I read or hear more on this project I will post it here.

Willow Creek Bridge
Posted March 19, 2019, by George Oakley (Georgeoakley49 [at] yahoo [dot] com)

This bridge will be closed by the end of April for deck and underside repair which will last 30 days with detours planned.During the closure the supervisors are requesting that one lane of the bridge be open for emergencies.The bridge may be subject to weight restrictions due to structural instability.This surprise PennDOT bridge closure came up during last Thursdays supervisors meeting.