Facts 

Overview
Steel through arch bridge over Clackamas River on OR 99E in Gladstone
Location
Gladstone, Clackamas County, Oregon
Status
Open to traffic
History
Built 1933
Builders
- Conde B. McCullough (Engineer)
- Lindstrom & Feigenson (Contractor)
Design
Steel through arch
Dimensions
Length of largest span: 240.0 ft.
Total length: 730.0 ft.
Deck width: 48.0 ft.
Vertical clearance above deck: 18.5 ft.
Inventory number
BH 29864 (Bridgehunter.com ID)

Update Log 

  • July 8, 2008: Updated by Michael Goff
  • June 12, 2008: Updated by Michael Goff
  • June 10, 2008: Updated by Michael Goff

Sources 

  • Michael Goff - michael [dot] goff [at] odot [dot] state [dot] or [dot] us