Overall condition: Good
Superstructure condition rating: Good(7 out of 9)
Substructure condition rating: Good(7 out of 9)
Deck condition rating: Good(7 out of 9)
Sufficiency rating: 75.6 (out of 100) View more at BridgeReports.com
Posted August 8, 2022, by Steve LIndsey (Steve Lindsey)
The second Elm Street Bridge, a steel through truss bridge, was replaced by the current Polygonal Warren pony truss in 1995 pictured, after this author sought an injunction against the replacement of a heritage bridge and failed to stop the construction of its replacement. This attractive bridge is the third truss bridge at the crossing.---SWL
The second Elm Street Bridge, a steel through truss bridge, was replaced by the current Polygonal Warren pony truss in 1995 pictured, after this author sought an injunction against the replacement of a heritage bridge and failed to stop the construction of its replacement. This attractive bridge is the third truss bridge at the crossing.---SWL