Rating:
5 votes

Forsyth Bridge

Photos 

Photo taken by montanatom1950

View this photo on Flickr

BH Photo #266530

Map 

Street View 

Description 

Although heavy rain disrupted the celebrations, it couldn’t dampen the enthusiasm Forsyth residents felt for their new bridge, dedicated on July 4, 1905. Prior to the bridge’s construction, Rose- bud County residents had to ford the Yellowstone River in low water or depend on an irregular ferry service; the nearest bridge was forty -five miles downstream at Miles City. Rosebud County commissioned William S. Hewett and Co. to construct this pin connected Pennsylvania through truss bridge for $53,200. One of Montana’s most prolific bridge builders, Hewett was responsible for the construction of at least fifteen Montana bridges in and around the Yellowstone Valley between 1897 and 1906. Construction began on December 22, 1904. The crew poured the massive concrete piers before assembling the large steel components, fabricated in the east and shipped to Forsyth by rail. Warming weather and spring flooding sometimes forced the bridge crew to work chest deep in cold water. Nevertheless, construction was completed ahead of schedule. Providing convenient access to the county seat and the Northern Pacific terminal, the bridge saw a marked increase in traffic after construction of the Milwaukee railroad brought homesteaders to north Rosebud County. Originally three spans in length, the southern span crossed the primary river channel; the two northern spans crossed the flood plains. When the bridge was closed in 1958, replaced by a concrete bridge several hundred yards upstream, two of its three spans were salvaged for scrap metal. The southernmost span remains, an example of the tremendous public investment in infrastructure that accompanied the homesteading boom."

From the "A Guide To Historic Forsyth" PDF, which can be found below in the "sources" section of this webpage.

Facts 

Overview
Abandoned bridge over Yellowstone River on US 12
Location
Forsyth, Rosebud County, Montana
Status
Abandoned
History
Built 1905, Closed with two spans removed for scrap 1958
Builder
- William S. Hewett & Co. of Minneapolis, Minnesota
Design
Pennsylvania through truss
Approximate latitude, longitude
+46.26684, -106.69100   (decimal degrees)
46°16'01" N, 106°41'28" W   (degrees°minutes'seconds")
Approximate UTM coordinates
13/369693/5125085 (zone/easting/northing)
Quadrangle map:
Forsyth
Inventory number
BH 58026 (Bridgehunter.com ID)

Update Log 

  • March 12, 2018: New photos from John Bernhisel
  • January 9, 2014: New photos from Jack Schmidt
  • October 4, 2013: Updated by Luke Harden: Tweaked description section a wee bit.
  • September 15, 2013: Added by Luke Harden

Sources