Rating:
22537
{61}%
2 votes
Wyaconda River Route C Bridge
Photos
Wyaconda River Route C Bridge
Photo taken by Chris Gonnerman in March 2012
License: Creative Commons Attribution-Share-Alike (CC BY-SA)
Enlarge
BH Photo #227847
Description
Bridge is currently under maintenance for repairs.
Facts
- Overview
- Through truss bridge over Wyaconda River on Route C
- Location
- Scotland County, Missouri
- Status
- Bridge damaged on 6-03-2020
- Future prospects
- Bridge is available for adaptive reuse, through 2/1/2021. See MoDOT Free Bridges web-site for details.
Bridge was damaged 6-03-2020 per MODOT website. States closed for maintenance until further notice. Access to bridge was closed when I visited 6-08-20.
- History
- Built 1936; rehabilitated 1946
- Builder
- - Vaughn Construction Co. (Contractor)
- Design
- Rigid-connected, 6-panel Pratt through truss
- Dimensions
-
Length of largest span: 124.6 ft.
Total length: 173.8 ft.
Deck width: 23.9 ft.
Vertical clearance above deck: 13.9 ft.
- Approximate latitude, longitude
- +40.55029, -92.20398 (decimal degrees)
40°33'01" N, 92°12'14" W (degrees°minutes'seconds")
- Approximate UTM coordinates
- 15/567400/4489141 (zone/easting/northing)
- Quadrangle map:
- Brock
- Land survey
- T. 66 N., R. 12 W., Sec. 11
- Average daily traffic (as of 2018)
- 70
- Inventory numbers
- MoDOT T-74R (Missouri Dept. of Transportation bridge number)
MONBI 8978 (Missouri bridge number on the National Bridge Inventory)
BH 22537 (Bridgehunter.com ID)
- Inspection report (as of June 2018)
- Overall condition: Poor
Superstructure condition rating: Poor (4 out of 9)
Substructure condition rating: Fair (5 out of 9)
Deck condition rating: Serious (3 out of 9)
Sufficiency rating: 29.5 (out of 100)
View more at BridgeReports.com
Update Log
- June 8, 2020: Updated by K. Allen Ballard: Corrected info per MODOT; bridge damaged 6-03-202; Closed for repairs
- September 25, 2012: Photo imported by Luke Harden
- March 17, 2012: New photos from Chris Gonnerman
Bridge T0074 was previously rated as a 3. It was closed to traffic following an inspection that showed further deterioration of floor beams and steel stringers.
Prior to its closure this bridge was slated for replacement in FY22, with the potential to be pushed back to FY23.