Facts 

Overview
Lost five-span open-spandrel arch bridge over Meramec River on MO 30
Location
Franklin County, Missouri
Status
Replaced by bridge on new alignment
History
Built 1929-30 by M.E. Gillioz; replaced 2002
Builder
- M.E. Gillioz of Monett, Missouri
Design
Open-spandrel arch
Dimensions
Length of largest span: 105.0 ft.
Total length: 824.9 ft.
Deck width: 22.3 ft.
Land survey
T. 41 N., R. 1 E., Sec. 4
USGS topographic map
Saint Clair
Inventory numbers
MONBI 5195 (Missouri bridge number on the National Bridge Inventory)
BH 21500 (Bridgehunter.com ID)