Surprisingly this bridge has been reopened. The floor has recently been replaced and I’m guessing that was the reason it was closed. There's a good 8" of asphalt on the floor now. (That should increase the load limit!)
GPS: 40.845496,-86.852905
Closed to all traffic. Accessible on 100 E from either north or south side. Closer on the north side, off E. Monon Road
1 North approach with closure signs
2 Truss and deck
3 Truss west face
4 Box girder truss work
5 Truss
6 Truss (east face)
Webmaster's note: The photos that were here have been incorporated into the main site.