Built 1909 (768)
Built during 1900s (7,194)
Chicago, Milwaukee, St. Paul & Pacific Railroad (1,019)
Idaho (455)
Open to pedestrians (4,169)
Rail-to-trail (1,513)
| Railroad (15,362)
Route Of The Hiawatha Trail (20)
Shoshone County, Idaho (46)
Total length 175-250 feet (4,253)
Tunnel (1,297)
|