Visited this bridge today 4/12/'11 at approx. 11 a.m. Structure is mostly riveted but there are some nuts and bolts. Bridge once had two rung guardrails but none are in place. Bridge decking is composed of concrete panels about 10 feet square that were cast off-site. Weight limit signs have graffiti. Generally the bridge is sound and carries significant truck traffic from gas drilling/exploration operations. Water was flowing clear in streambed. Some high water debris noted wedged on lower chord. Posted 4 new photos to this page.